Main Bathroom: The tiny room that took FOREVER!

With four kids amidst the chaos of moving and remodeling, pictures are pretty much the last thing on my mind. The bathroom did not look quite as bad as our before pictures below, but we’ll call it a miracle that I remembered to get pictures before the demo was complete. The bathroom had peeling linoleum stick tiles, old plumbing, old cast iron tub, no closet and peeling lead paint. For such a tiny room it required a LOT of work. The demo was actually a slow process as we attempted to make minor improvements before we were ready to commit to a full rip. This was likely the only time a homeowner is thankful previous builders used cheaper material. The gorgeous pink tiles were only plastic with some adhesive. Plaster is a huge mess so not adding real tile to the mix was a great thing. As you can see, the window was removed. This facilitate throwing the material straight into the dump making clean up much easier. We were thankful to once again have help from our friends as that cast iron tub was quite a beast.

20141129_100131 20141129_100137 20141129_100140

Our original plan was to complete the second bathroom we were planning to add on the third floor prior to ripping out the one and only bathroom in this house. While that would have been convenient for day to day living, it simply was not practical from a construction stand point. We needed to run new plumbing and add lines for the third floor. We simply needed to do this bathroom before even considering adding the third floor bath. We finished the demo on December 6th but we did not get a shower installed until December 15th! Thankfully it was the final week we had to travel for showers. Prior to demoing we had some plumbing issues and often showered elsewhere. It was a little odd to shower while seeing the studs. We opted for a rainfall style shower head and if we closed our eyes we could pretend we had an actual nice bathing space despite the studs…

20141206_013309  20141215_092154

Remodeling can be harder than simply building as you already have space restrictions and previous plumbing/electric lines dictating parts of your design. We already planned to move the third floor stairs so we added about a foot of space to the bathroom and opted for a larger rectangular shower stall vs the smaller square one. We considered a shower/bath combo but decided we wanted to make better use of the space. We will have a bathtub upstairs so we were okay with just adding a shower and leaving more room for storage and breathing (yea, it is a REALLY small full bath). While we had the walls open we also ran new plumbing as necessary, added the lines for our third floor bathroom and we ran the lines for eventually moving the basement laundry to the second floor (waiting very impatiently for that!) We needed to add a few electric outlets, recessed lighting and ventilation fan before we could drywall. We also moved the radiator pipes to take up less room and boxed in one of the overhead drains. Though our bathroom still needed a ton of work, having drywall made the shower much more relaxing!

20150116_073334    20150116_073345

Boxing in an overhead pipe, framing a shower stall and moving the wall about a foot meant there were LOTS of corners requiring spackling. This tiny space proved to be quite the tedious task for Ed spackling all of the corners. Once the spackling was finally complete he was able to begin tiling. Our plumber, and friend, was a HUGE help. Not only had he already ran new plumbing, aided in framing the shower and installed the shower, he offered to help Ed with the tiling. We were going to do just basic tile but with a small bathroom material costs are not very high so we opted to use a nicer tile with accent pieces. Quick set adhesive was used so we could reinstall the toilet after just a couple hours.

20150124_142210 20150124_142355 20150124_174719

After spackling, we were finally able to paint and add a vanity. It was definitely beginning to resemble a real bathroom!

20150203_144403

We wanted to add a closet but opted for a large cabinet to keep the small space feeling open. We added a medicine cabinet for a little more storage. Crown molding was also added.

20150328_184014 20150328_184208 20150328_183832 20150328_183929 20150328_184234 20150328_184320

Due to the layout and window lighting it was nearly impossible to get a good shot of most of the bathroom. The pictures can hardly show just how much work went into this tiny space, but it was definitely worth it!

 

A Place To Lay Our Heads

When we moved in we knew it would be at least a few months until we would have an organized and comfortable place to rest. We moved our mattress into the existing master bedroom and left our clothes in boxes. We decided it would be too difficult to move in the furniture and then try to demo and rebuild around it. We did not have a ton of space to work with but we knew we needed adequate closet space and room for our king sized bed was a necessity.

20150216_140449 20150216_140456 20150216_140505

I thought being in an unfinished room and living out of boxes was difficult, but the real challenge came when we needed to demo the room. We moved two small Ikea mattresses into the living room and spent a couple weeks camping out each night. Every morning we folded up the mattresses and attempted to make our house seem “normal.”

 

20150222_085027-e1425499592575-225x300

We were fortunate to have the help of a few friends and the ability to use a dump truck to aid in the demo process. Ripping out plaster and getting four walls and a ceiling down to the studs can make a ridiculous mess. We started with just one outlet in the bedroom so we had an electrician come in and add several new outlets. We also added recessed lighting and ran the wires for a ceiling fan. We exposed the brick fire wall and insulated the exterior walls, the joint wall with the bathroom and the ceiling. We will eventually have four boys on the floor above us so insulating wasn’t optional.

20150216_151251 20150216_140517 20150217_084925(0)

One full wall and two half walls were drywalled, we left exposed brick in the closet and we did one full and one half wall with wood for an accent. We chose a cool blue color which we felt went well with the earthy tones of wood and brick.

20150304_100607 20150307_145049 20150307_144934

20150307_144708 20150313_192257

We have plans to do a barn style closet door. We purchased the door but in an effort to remain in budget and keep this a debt free remodel we have put purchasing the hardware on hold. We put a vanity area in the closet as well. I am looking forward to having the door, this way when I’m running late I can close the door and pretend my room is clean after the mess of getting ready!

20150315_235639 20150328_184712 20150328_184748 20150328_184755

We reused all of our old bedroom furniture but purchased new linens to match the different style. We left the original hardwood floors.

20150315_235704             20150315_235617

We had a great sized mirror from an estate clean out that did not match. We were able to paint it and it fits perfectly above our dresser.

20150322_001404  20150328_184912

We also added crown molding and oversized base boards for looks as well as simplifying the spackling and painting process. We are very pleased with how our room turned out. The first night we slept in a REAL bed (frame, boxspring and all!) we slept better than we had in months. A relaxing and comfortable bedroom definitely improved our nightly rest and therefor our days.

20150328_184645 20150328_184655 20150328_184613

20150328_184844